On under construction vs ready to move, the trade-off is simple to state. An under-construction flat usually costs less at the headline price. But you pay GST, you wait, and you carry the risk of delay. A ready-to-move flat costs more upfront. You can see it, measure it and check its occupancy certificate before you pay. Bought after completion, it carries no GST. The right choice depends on the total cost and how much risk you can carry.
The two options side by side
| Point | Under construction | Ready to move |
|---|---|---|
| Headline price | Often lower | Often higher |
| GST | 5% of the price for most homes, 1% for affordable homes | None if paid for in full after the completion certificate; none on a resale |
| What you can inspect | A sample flat and the site | The actual flat |
| Occupancy certificate | Not issued yet | Should be available to see |
| Main risk | Delay, changes to the plan, builder trouble | Defects and age, which you can mostly see |
| Cost while you wait | Rent plus pre-EMI interest | None after you move in |
| Home loan | Released in stages | Released in one go |
Pre-EMI interest is the interest you pay on the part of the loan released so far, before full repayments begin.
The price gap and what it pays for
Builders often price flats lower at launch and raise prices as work goes on. The discount pays you for waiting and for the risk you take. There is no standard size for that gap. It depends on the builder’s record, the stage of work and the local market.
To compare fairly, put both flats on the same basis:
- Convert both prices to a rate per sq ft of carpet area. Our guide on carpet area vs built-up area shows how.
- Add every extra: GST, parking, PLC, floor rise, club fees and deposits.
- Add the cost of waiting: rent until possession, plus pre-EMI interest.
- Allow for a delay. Ask what a year’s delay would cost you.
GST: 5% or 1%, or nothing
GST on new homes changed on 1 April 2019, after the GST Council’s decisions in March 2019. For a flat under construction, the rates are:
- 1% of the price for an affordable home. Affordable means a value of up to ₹45 lakh. The carpet area must also be up to 60 sq m in metro cities, or 90 sq m elsewhere.
- 5% of the price for other homes.
Both rates come without input tax credit, so the builder cannot set off the tax it paid on materials. Both already allow for the value of land. As far as we could find, the GST rate changes of September 2025 did not alter these rates. Check the builder’s invoice, and ask your chartered accountant if the rate looks wrong.
A ready flat is outside GST if the whole price is paid after the completion certificate, or after first occupation, whichever is earlier. A resale flat bought from its owner carries no GST either. But if any part of the price reaches the builder before the certificate, GST applies.
Extras follow the flat. In October 2024 the government clarified that preferential location charges paid before completion carry the same GST as the flat. Our guide to PLC and floor rise charges explains these charges.
Delay risk and RERA protections
The main risk with an under-construction flat is that it arrives late, or not at all. RERA, the real estate law of 2016, gives buyers some protection:
- Section 13. A builder cannot take more than 10% of the cost as an advance or application fee. Anything more must wait for a written, registered agreement for sale.
- Section 18. If the builder fails to hand over on time, you can withdraw and get your money back with interest and compensation. Or you can stay and get interest for every month of delay until possession. State rules set the interest rate.
- Disclosure. The builder must register the project and disclose the carpet area of each flat.
These rights help, but they do not remove the risk. Claims take time, and a builder in financial trouble may not pay quickly. Check the project’s registration, progress reports and complaints on your state’s RERA website before you book.
What the bank values at each stage
For a flat under construction, the bank’s panel valuer usually values the finished flat, using sales nearby. The bank then releases the loan in stages as work progresses. It may ask for a stage report before each release. Our guide on under-construction flat loan valuation covers this in detail.
For a ready flat, the bank checks the building as it stands. In December 2024 the Supreme Court told banks to lend only after verifying the completion or occupation certificate. So a “ready” flat without one may not get a loan at all.
In both cases, the bank lends on its valuer’s figure, not on your price. If the bank values the flat lower, you pay the gap yourself. See why bank valuation is lower than market value.
What a ready flat lets you check
With a ready flat you can test what an under-construction flat only promises. You can:
- measure the carpet area and compare it with the agreement;
- see the finish, the light, the view and the neighbours;
- check for leaks, cracks and poor work;
- see the occupancy certificate and the society’s records.
Those checks reduce surprises. They are also what a valuer looks at on site before you buy.
Which one suits you
An under-construction flat can suit you if you have a stable place to live while you wait. It also helps if you can afford rent and loan interest together, and you trust the builder’s record. Check how many of the builder’s past projects were handed over on time.
A ready flat suits you if you need to move soon or cannot carry two housing costs at once. It also suits buyers who want to see exactly what they buy. And the loan is released in one go, without stage-by-stage checks.
A worked illustration
Two flats in the same area each have 1,000 sq ft of carpet area.
- Under construction: ₹1 crore, with possession promised in two years. GST at 5% adds ₹5 lakh. You pay rent of ₹30,000 a month for two years, which is ₹7.2 lakh. Pre-EMI interest adds about ₹4 lakh. The total before any delay is about ₹1.16 crore.
- Ready to move, with an occupancy certificate: ₹1.12 crore, with no GST and no rent once you move in.
On these figures, the ready flat costs less in total, and you can inspect it first. A one-year delay would widen the gap. Change the numbers and the answer may flip, so do the sum with your own figures. (Figures are an illustration only.)
Comparing a launch offer with a ready flat? Send both on WhatsApp: the addresses, the price breakups and the builder’s payment plan. Our pre-purchase valuation values both on the same basis, and an engineer inspects each in person. The fee is fixed and quoted upfront.