A property with unauthorised construction is worth less than the same property built as approved. It is also harder to finance and harder to sell. That means building work done without approval, or work that departs from the sanctioned plan. A valuer values the approved part and shows the rest separately, with the risk spelt out. Recent Supreme Court rulings have made that risk larger, so check before you pay.
What counts as unauthorised construction
Most cases fall into a few types:
| Type | Common examples | Why it matters |
|---|---|---|
| Extra floor or rooms | A floor above the sanctioned number; a room on the terrace | May face demolition; usually not counted in value |
| Extra covered area | Enclosed balconies, merged flats, built-over setbacks | Depends on local rules; often left out of value |
| Covered stilt | A parking stilt turned into rooms or a shop | Often acted on; parking rights may be lost |
| Change of use | A home used as a shop or office without permission | Can bring penalties or sealing |
| Internal changes | Moved walls, a shifted kitchen or toilet | Often lower risk, unless the structure is affected |
Setbacks are the open margins a building must leave around it. Sealing means the authority locks up the premises until the breach is cured.
Local rules decide what can be approved later. Many cities let small departures be compounded. That means approved later, for a fee. Larger ones often cannot be. Ask a local architect or lawyer what your municipal rules allow.
What the Supreme Court has said
Two recent rulings shape how buyers, banks and valuers look at this.
Rajendra Kumar Barjatya v. U.P. Avas Evam Vikas Parishad, 17 December 2024. The Court gave directions on unauthorised buildings. Banks are to lend against a building only after they check its completion or occupation certificate. Power, water and sewer links are to come only after the owner shows that certificate. The Court also said schemes to legalise such work should be rare. Even then, they should be a one-time step for homes, after a full survey.
Kaniz Ahmed v. Sabuddin, 30 April 2025. This case was about two unauthorised floors in Kolkata. The Court would not let the owner ask for the floors to be legalised. It said such work has to be pulled down. It added that courts should not be quick to legalise buildings put up without permission.
For a buyer, the message is plain. Do not assume that an extra floor or a covered stilt can be legalised later.
How a valuer treats unauthorised parts
A valuer compares the building with the approved plan and the completion or occupancy certificate. Then the valuer works in this order:
- The approved part is valued in full, using registered sales of similar approved property.
- Unauthorised area is usually left out, or shown separately with a clear warning.
- The risk of demolition or restoration is noted, with a rough cost where it can be judged.
- Small deviations that can be compounded may be valued after taking off the likely fee and the cost of any work.
Bank valuers work the same way. Their report formats ask them to list deviations. That is why a flat with an enclosed balcony often gets a bank value below its price. Our guide on home loan technical verification explains the bank’s checks.
The effect on your home loan
A deviation can affect your loan in three ways:
- A lower value. The bank lends only on the approved area, so the loan is smaller.
- A refused loan. Without a completion or occupation certificate, many lenders will not lend at all after the December 2024 ruling.
- Later trouble. If the authority acts against the building, the bank’s security is weakened. Your loan does not shrink with it.
If the bank values the flat below the price, you pay the gap yourself. See why bank valuation is lower than market value.
Deal with it before you buy
Once you own the property, the problem is yours. So settle it before you sign:
- Get the sanctioned plan and the certificate. Compare them with what you see, floor by floor. Our resale flat valuation checklist lists the other papers.
- Ask the seller to get the deviation approved before the sale, where local rules allow it.
- Or ask the seller to remove it and restore the approved layout.
- Or reduce the price to cover the cost, the delay and the risk. Put the terms in the agreement.
- Ask your lawyer whether any notice or case is pending against the building.
Extra floors and covered stilts are common in builder floors. Our guide on builder floor valuation covers the checks for those buildings.
Questions to ask the seller
Keep these short and put them in writing:
- Was this part built with approval? Can I see the plan?
- When was it built, and by whom?
- Has the city or the society sent any notice about it?
- Has anyone applied to get it approved? What happened?
- Will you fix it, or lower the price, before we sign?
Vague answers are a warning. A seller with nothing to hide can usually show the papers.
A worked illustration
A flat is offered for ₹1 crore. Its approved carpet area is 900 sq ft. The seller has enclosed a 100 sq ft balcony and describes the flat as 1,000 sq ft.
Registered sales of similar approved flats nearby work out to ₹10,000 per sq ft of carpet area. On the approved area, the flat is worth about ₹90 lakh. The enclosed balcony is valued as a balcony, adding perhaps ₹3 lakh. The report notes that the enclosure may have to come down, at a cost of about ₹50,000. A bank is likely to lend on the approved area only.
So the evidence supports about ₹93 lakh, not ₹1 crore. (Figures are an illustration only.)
Mistakes to avoid
- Paying the full rate for area that was never approved.
- Taking “everyone in this building has done it” as proof that it is safe.
- Relying on a promise that the deviation will be regularised after the sale.
- Skipping the sanctioned plan because the building looks finished.
For a pre-purchase valuation, send us the address and the asking price on WhatsApp. Add the sanctioned plan or completion certificate, if the seller has shared them. Mention any changes you have noticed. Our engineer compares the building with the approved plan on site. The fee is fixed and quoted upfront.