The average clause in fire insurance cuts your claim when the sum insured is lower than the property’s real value. You are treated as your own insurer for the gap, and you carry that share of any loss yourself. Insure a building for half its value and you get about half of any partial claim. The fix is to insure each item for its full value at risk, on the basis your policy uses.
What the average clause says
Most fire policies carry a general condition called average. Its wording is old, but the meaning is plain. If the property is worth more than its sum insured when the fire breaks out, you are “your own insurer for the difference”. You then bear a rateable share of the loss. Rateable simply means in proportion.
Two details matter. First, every item on the policy is tested separately. A well insured building does not rescue an underinsured stock item. Second, the value is checked at the time of the loss, not when you bought the policy.
Reinstatement cover has its own version. The reinstatement memorandum compares the sum insured with the cost of rebuilding the whole item new. If that cost is higher, the same proportional cut applies. Our guide to reinstatement value of a building for insurance explains that basis.
The formula
The claim works out like this:
Claim = loss assessed × sum insured ÷ value at risk
The value at risk is the full value of the insured item on the date of loss. On a reinstatement basis, it is the full rebuild cost. On a market value basis, it is the rebuild cost less depreciation. The policy excess, a fixed amount you always bear, then comes off.
The Supreme Court used the first two rows below as its example in I.C. Sharma (2018). The third shows the same loss with full cover.
| Sum insured | Value at risk | Loss | Claim paid |
|---|---|---|---|
| ₹50 lakh | ₹1 crore | ₹40 lakh, part of the property | ₹20 lakh |
| ₹50 lakh | ₹1 crore | ₹1 crore, everything destroyed | ₹50 lakh |
| ₹1 crore | ₹1 crore | ₹40 lakh, part of the property | ₹40 lakh |
The second row shows that a total loss is not averaged. You get the sum insured. But the shortfall still costs you, because the payout stops there.
How the value at risk is found
The surveyor appointed by the insurer works out the value at risk after the loss. For a building, that usually means measuring it and pricing a rebuild at current rates. For plant, it means today’s price of similar new machines, with freight, taxes and erection added.
In the Delhi case below, the surveyor explained his figure under cross-examination. He added the invoice price, taxes and duties, freight, erection and other costs, then took off tax credits. That total became the reinstatement value.
You cannot stop this test from happening, but you can make sure your own figure stands up. A sum insured built from measured areas and stated rates is easy to compare. A round number picked at renewal is not. If your figure and the surveyor’s differ, the basis on paper is what you will argue from.
Worked example
A manufacturer insures its factory building for ₹2 crore. That figure came from its books years ago. The policy is Bharat Laghu Udyam Suraksha, which ignores underinsurance only up to 15%.
A fire damages the roof and one wall. The surveyor finds the loss is ₹48 lakh. The surveyor also puts the cost to rebuild the whole building at ₹3.2 crore.
- Sum insured as a share of the value at risk: ₹2 crore ÷ ₹3.2 crore = 62.5%.
- The shortfall is 37.5%, well beyond the 15% the policy ignores.
- So the full cut applies: ₹48 lakh × 62.5% = ₹30 lakh.
- The owner carries ₹18 lakh of the loss, plus the excess.
Had the building been insured for ₹2.8 crore, the shortfall would have been 12.5%. That is inside the 15% band, so the whole ₹48 lakh would have been paid, less the excess. (Figures are an illustration only.)
What the courts have said
The Supreme Court upheld a proportional cut of 25.71% in Sikka Papers (2009). It said the insurer works out underinsurance when it assesses the loss. In I.C. Sharma (2018) it added that underinsurance, often done to save premium, harms the policyholder rather than the insurer.
In August 2026 the Delhi High Court applied both rulings to a power plant. The owner had insured it on depreciated book value, at about ₹2,347 crore. The surveyor put its rebuild cost at ₹5,400 crore, so it was underinsured by 56.53%. An arbitration panel refused the cut because the claim was for repairs. The court set that award aside. No premium had been paid on the uninsured part, so the owner had to bear its share of the loss.
The lesson for any business is direct. Book value is an accounting figure, not a sum insured. A repair claim is averaged just like any other partial loss.
Where the clause is softened
IRDAI’s standard fire products, in use since April 2021, change the rule for smaller risks:
- Bharat Griha Raksha, for homes, says underinsurance does not apply.
- Bharat Sookshma Udyam Suraksha, for business risks up to ₹5 crore at one location, ignores underinsurance up to 15%.
- Bharat Laghu Udyam Suraksha, for risks above ₹5 crore and up to ₹50 crore, has the same 15% band.
In both business policies, a shortfall beyond 15% is cut in full, not just the part above 15%. Larger risks usually sit under a Standard Fire and Special Perils policy, where average applies in full. Your own wording decides, so read the conditions section.
How to stay clear of the average clause
- Use the right basis. On reinstatement cover, insure the full rebuild cost, not the depreciated value.
- List items separately. Give each building, and plant and stock, its own sum insured.
- Update at each renewal. Building costs rise, and a figure that was right three years ago may now be short.
- Report additions. A new floor or shed raises the value at risk at once.
- Ask about an escalation clause. For extra premium, it raises the sum insured a little each day.
- Keep the basis on file. A measured valuation helps if the surveyor questions your figures later.
Factories often need separate figures for sheds, offices and services. Our guide to factory valuation covers how such sites are split. If a loss has already happened, read property insurance claim valuation first.
Want to know if your buildings are underinsured? Send us on WhatsApp the policy schedule, a list of buildings with their years of construction and the site address. We will tell you which items look short and quote a fixed fee for an insurance valuation. For industrial sites with plant and land as well, see industrial property valuation.