Depreciation of building in valuation means cutting a building’s cost to build new today, to allow for age, wear and lost usefulness. Valuers apply it to the building only. Land does not wear out, so it is valued on its own. The most common method is age-life. The building loses value in step with how much of its useful life has gone, after keeping back a salvage value. Condition then nudges the result up or down.
Why land does not depreciate
A building starts to age the day it is finished. Paint fades, pipes corrode, roofs leak and fittings go out of date. Land does none of this. Its price may rise or fall with the market, but that is a change in value, not wear.
So valuers split a property in two. The land is valued from sales of similar plots and the circle rate. The building is valued at what it would cost to build new today, less depreciation. The two are then added. This is called the cost approach, one of several methods covered in property valuation methods.
For flats, the land is your share of the plot. The same split still applies, though valuers often check the result against flat sales nearby. In a tall building each flat’s share of land is small. So the building part, and its depreciation, carries more of the value.
The age-life method
The age-life method, also called straight-line, assumes a building loses the same amount of value each year. In plain words:
Depreciated value = cost new today × [1 − (1 − salvage share) × age ÷ total life]
- Cost new today is the replacement cost: what a similar building would cost to build now. Our guide to construction cost per square foot shows how that is estimated.
- Age is the years since the building was completed.
- Total life is the normal useful life for that type of structure.
- Salvage share is what the building is worth at the end of its life, as reusable material or scrap.
With a 60-year life and a 10% salvage share, the loss builds up like this:
| Age | Share of life used | Depreciation | Value left |
|---|---|---|---|
| 10 years | One sixth | 15% | 85% |
| 20 years | One third | 30% | 70% |
| 30 years | Half | 45% | 55% |
| 45 years | Three quarters | 67.5% | 32.5% |
| 60 years or more | All of it | 90% | 10% |
These are assumptions for the table only. Your report may use a different life or salvage share.
Total life and salvage value
No statute fixes the life of a building for valuation. Valuers use conventions based on the type of structure. A well-built concrete frame usually gets a longer life than load-bearing brick walls. A light shed or temporary structure gets much less. A salvage share of about 10% is a common assumption.
Straight-line is not the only method. Some valuers use a curve that loses value slowly in early years and faster later. Others score the condition of each part, such as the frame, roof and services. Whatever the method, it should be named in the report.
These choices change the answer a lot. So a good report states the total life and salvage share it used, and why. If the life looks too short for a sound building, you can ask the valuer to explain it.
Condition and effective age
Real buildings do not age at the textbook rate. Valuers therefore think in terms of effective age.
- A building that was well kept, or renovated with new plumbing, wiring and waterproofing, may be treated as younger than it is.
- A neglected building with leaks, cracks and rusting steel may be treated as older.
- A building that no longer suits its use, such as an old walk-up office with no lift, loses value too. This is called obsolescence.
- A nuisance nearby, such as a new flyover at window level, can also cut value. Valuers usually show that in the market evidence rather than in the building’s age.
Where distress looks serious, a valuer should not just raise the age and move on. The building may need a proper structural audit, with tests, before anyone puts a figure on its remaining life.
The year of completion is the starting point for all of this. Our guide to the age of building certificate explains how that year is proved.
Where depreciation shows up
| Purpose | Is the building depreciated? |
|---|---|
| Bank valuation of land and building | Yes, for age and condition |
| Value as on 1 April 2001 for capital gains | Yes, back to its age in 2001 |
| Insurance on a market value basis | Yes. The policy defines market value as reinstatement value less depreciation |
| Insurance on a reinstatement basis | No. The sum insured is the full rebuild cost |
| Tax returns and company accounts | A different, accounting depreciation |
The capital gains case is common. A building valued as on 2001 is depreciated for its age then, not now. See fair market value as on 1 April 2001. For insurance, the full rebuild cost is explained in reinstatement value for insurance.
Book value in a company’s accounts is not a valuation. In August 2026 the Delhi High Court dealt with a plant insured on its depreciated book value. Its rebuild cost was more than twice the sum insured, and the claim was cut in proportion.
Worked illustration
A house in Pune stands on a plot valued at ₹1.2 crore from recent sales. Building it new today would cost ₹60 lakh. The house is 24 years old. The valuer assumes a 60-year life and a 10% salvage share.
- Depreciation share: 0.9 × 24 ÷ 60 = 36%.
- Building value: ₹60 lakh × 64% = ₹38.4 lakh.
- The house was rewired and waterproofed five years ago, so the valuer takes an effective age of 20 years. Depreciation becomes 30%, and the building value ₹42 lakh.
- Land plus building: ₹1.2 crore + ₹42 lakh = ₹1.62 crore.
The valuer then checks this against sales of similar houses nearby. (Figures are an illustration only.)
Mistakes to avoid
- Depreciating the land along with the building.
- Using the depreciation rates from tax returns or company accounts.
- Giving no stated life or salvage share.
- Depreciating a figure meant as a reinstatement sum insured.
- Using one age for a building with a later floor or wing.
- Ignoring repairs that clearly extend the building’s life.
If you need a property valued with the building properly depreciated, send us on WhatsApp the address, the year of construction and any later additions. Our fair market value valuation sets out the land value, the building cost and every depreciation assumption, at a fixed fee quoted upfront. If you need only the age, remaining life or condition of the building, see our chartered engineer certificate service.